1. The Main Power Inspection
2. Visual inspection for the general condition of MDB
3. Inspection of SDB in each building
4. Inspection of lighting and power socket outlet systems
Note: Thermal scans will need to be carried out during normal operations when the electrical system has peak loading.
: 2022-03-24 16:16:22
: ECME Admin